























Architectural consultancy & PD services for Company 3 to relocate their US facilities from Soho to Chancery Lane (whilst working with Level Acoustic Design). The new facilities included two large Dolby Atmos-equipped DI theatres with Dolby Vision 3D (the second largest in London at the time), three Atmos HE mix rooms and a large editorial facility, supporting office workplace and hospitality areas spread over three floor levels. Close collaboration was needed to lead the LA and London clients to identify a clear set of their needs and requirements. Work included planning consultancy, POE of the completed facilities, and later layout modifications to reflect changes in the film industry.
client:
services:
project size:
status:
Company 3, UK Headquarters, London
Full architectural design services from RIBA stage 1 - 6 including post occupancy evaluation.
Principal Designer (CDM) services.
1585m2 (17,050sq.ft)
completion 2023